2011 Tsunami at the Port of Brookings, Oregon

On March 11, 2011, we received a request from the Port of Brookings, Oregon, to assist in the response, already initiated by the Port Director, Mr. Ted Fitzgerald, to the effects of Japan’s devastating earthquake and destructive tsunami surges.

As wave surges had begun arriving and entering the Port of Brookings harbor in mid-morning of the 11th, Ted and members of his crew had already been working down at the docks for hours. Due to their early response, most of the commercial recreational boat owners had been notified, and many had been able to get their vessels out of the harbor and harm’s way.

Though it could have been much worse, serious damage nevertheless occurred that day at the Port of Brookings, the Port just southward at Crescent City, CA, and other Oregon Ports north of Brookings (e.g. Gold Beach, Port Orford and Bandon).

In addition to the destruction of numerous docks and piles, and some vessels, an estimated 30,000 cubic yards of sediment and debris had within the harbor of the Port of Brookings accumulated as a result of the tsunami wave surges.

Response had to be immediate. FEMA & OEM were of tremendous assistance.

Since 2009 we have entered into projects to assist a number of other south coast projects at various ports, providing engineering planning and design, permitting, landslide revetments repair, dredge and disposal planning, sediment planning, sampling, evaluation and characterization, submerged aquatic vegetation survey, avoidance and mitigation , equipment evaluation and specification, provided assistance in obtaining federal and state grants, etc.

 

The Coast Guard conducts tsunami flyover in Brookings, Oregon on March 11, 2011.


Dredge at Sport Transient Dock

Dredge & Pipe System Description Part 1 of 2

 

Dredge & Pipe System Description Part 2 of 2

 


Port of Bandon Project, 2015

Dredging & Disposal Plan

Click on each image to view corresponding PDF

Dredging and Disposal Plan: Port of Bandon

Port Site Plan

9-28 image

 

Post Project Conditions

Click on the image to view PDF

 

 

NOTE: THE TOTAL VOLUME OF SEDIMENTS REMOVED IN THIS EVENT, INCLUDING SEDIMENT THAT HAD SHOALED INTO THE PORT BETWEEN THE BASE BATHYMETRIC SURVEY (2013) AND THE DREDGING EVENT, IS APPROXIMATELY 31,600 CUBIC YARDS.

 

 


Port of Gold Beach Project, 2016

Dredging & Disposal Plan

Click on the image to view PDF

 

 

 

Post Project Conditions

Page in progress

 

 


Submerged Aquatic Vegetation

Click on each image to view corresponding PDF

Eelgrass - Port of Bandon

Port of Bandon screenshot

 

Survey - Port of Bandon

SAV Survey-Port of Bandon screenshot

 


Equipment Mobilization

Dredge Staged for Crane-Lift
Lift Begins
Placed On Land
Pontoons-Hull-Cutter Head Inspected
Dredge Placed on Trailer for Transport
5-Dredge Placed on Trailer for Transport
Headed to Gold Beach
6-Headed to Gold Beach
Assembly Continues at Gold Beach
Assembly Continues at Gold Beach
[[[/[/

 


Sediment Characterization

Click on each image to view corresponding PDF

Port of Alsea

SCR-Alsea screenshot

Port of Gold Beach

 

Salmon Harbor Marina

SHM -SCR screenshot